• Main Street, Ardee, Co. Louth
  • info@ardeepost.com
  • Opening Time : Always Open
Plans for 45 new homes in Ardee enter planning stage

Plans for 45 new homes in Ardee enter planning stage

Advertisements
  • SAFE (Suicide Awareness For Everyone) Castlebellingham
  • KW
  • Mr iPhone Phone
Plans for 45 new homes in Ardee enter planning stage
SAFE (Suicide Awareness For Everyone) Castlebellingham

By ArdeePost Reporter



Plans are underway for a major new housing development in Ardee, with MRM Structural Limited seeking planning permission from Louth County Council for a mixed residential scheme at The Blackridge, Townpark
, Ardee

The proposed development, which is currently at a pre-validation stage, outlines the construction of 45 homes comprising both houses and apartments. According to the application, the project aims to deliver a mix of family homes and smaller units to cater for a broad spectrum of housing needs in the town.

The breakdown of the development includes:

  • 23 dwellings – consisting of 20 three-bedroom houses and three four-bedroom houses, with a mix of two and three-storey designs.
  • 22 apartments – spread across three separate blocks, with a balance of one-bed and two-bed units.

Apartment Layouts:

  • Block A: Four one-bed and four two-bed apartments (two storeys).
  • Block B: Three one-bed and three two-bed apartments (two storeys).
  • Block C: Four one-bed and four two-bed apartments (two storeys).

The developer is also seeking approval for a new vehicular and pedestrian access from The Black Ridge road, with associated upgrades including the construction of a new footpath and improvements to sections of the existing adjoining road.

Facilities and Infrastructure

The application outlines a strong focus on modern residential amenities and sustainable transport:

  • Car Parking: A mix of in-curtilage parking for houses and on-street parking for apartment residents.
  • Electric Vehicle Charging: Ducting and infrastructure to allow EV charge points across the development.
  • Bicycle and Bin Storage: Dedicated storage areas adjacent to the apartment blocks.
  • Open Spaces: A combination of communal and public landscaped areas, including a formal children’s play area.
  • Lighting and Landscaping: Public lighting, planting, and a range of boundary treatments such as walls, fencing, and railings.

Decision Timeline

The application is currently at pre-validation stage with Louth County Council. A final decision on the proposed development is expected by 20 October 2025, with submissions from the public invited until 29 September 2025.

If granted, the scheme would represent a significant addition to Ardee’s housing stock at a time when demand for homes continues to outstrip supply locally and nationally.